Method and apparatus for providing load dispatch and pollution control optimization
CA 2523935 C · Owner: Emerson Process Management Power & Water Solutions, Inc. · Inventors: Huff, Frederick C.; Cheng, Xu
Overview
Its claims, description and drawings are in the Canadian Patents Database.
Open the CIPO recordAbstract From the Canadian patent
An economic dispatch program allocates a load demand and an emission allowance of a power generation system among various power plants to determine the operational set-points and the pollution control set-points of each of the various power plants in a manner that minimizes the total operating cost for the power generation system including the pollution control cost. The economic dispatch program uses the pollution control set-points and the load set-points of the various power plants as decision variables and takes into consideration the pollution control costs of the various power plants in allocating the load demand. During operation the economic dispatch program takes into consideration …
Read the whole patent
Listed from its CIPO record in Patent Yard's archive of Canadian patents past their term. Its claims, description and drawings are in the CIPO record and on Google Patents, and the Claude kit works from them.
Why it's free to use
- Filed October 20, 2005 and granted November 3, 2020. A Canadian patent filed from October 1, 1989 lasts 20 years from filing, so its term ended October 20, 2025.
- Certificates of supplementary protection extend only drug patents, and it isn't classified as one.
- We check Canadian rights only. A patent in its family in another country could still be in force: check its family on Google Patents.
Timeline
Timeline From CIPO dates
Sources & verification
Official CIPO records
Everything on this page comes from the CIPO record linked above. Contains information licensed under the Open Government Licence – Canada.