Cable stayed bridge construction
CA 2020499 C · Owner: Webster, David R. · Inventors: Webster, David R.
Overview
Its claims, description and drawings are in the Canadian Patents Database.
Open the CIPO recordAbstract From the Canadian patent
A cable stayed bridge which includes a pair of towers on either side of a gap and a roadway deck extending across the gap between the towers and cable stays fanning out from the top of each tower to separate longitudinally spaced load-bearing points on the decks such that a pair of cable stays extends from each load-bearing point on the deck to the tops of the respective towers with a span between towers 10 to 20 times tower height above the deck.
Read the whole patent
Listed from its CIPO record in Patent Yard's archive of Canadian patents past their term. Its claims, description and drawings are in the CIPO record and on Google Patents, and the Claude kit works from them.
Why it's free to use
- Filed July 5, 1990 and granted July 23, 1996. A Canadian patent filed from October 1, 1989 lasts 20 years from filing, so its term ended July 5, 2010.
- A certificate of supplementary protection adds at most two years for a drug, so even that would have ended by July 5, 2012.
- We check Canadian rights only. A patent in its family in another country could still be in force: check its family on Google Patents.
Timeline
Timeline From CIPO dates
Sources & verification
Official CIPO records
Everything on this page comes from the CIPO record linked above. Contains information licensed under the Open Government Licence – Canada.